|
|
 |
20 December 2008
Ginlong will have the new manufacture center in the first quarter of 2009. The new manufacture center is located at the new Xiangshan Industrial area which is about 20kms away from Ginlong's current location. We will keep the current basis and move part of the manufacture to the new manufacture center. The size of new factory is about 20,000 square meters, which is one of the biggest in the world for small scale wind turbine manufacture. The new factory will also be equipped the most advanced machines with our most skilled technicians and workers. With this newly finished factory, Ginlong will keep its top position in the world, not only for its R&D capability, but manufacture capability.
|
12 December 2008
Ginlong become the winner of Top High-Tech Project Award in Xiangshan County. Ginlong becomes the winner of this extremely competitive campaign among the selected hundreds of high-tech projects carried out between 2005 and 2008. This campaign is run by the government and widely considered as the most reputable campaign for high-tech projects. |
30 September 2008
Ginlong had a great show in Husum Windenergy 2008. There were over 300 people showing their interest in Ginlong products, and the existing clients also gave us the positive feedback from their experience in using Ginlong products. We will contiune to attend the Husum windenergy show in 2010 and you are welcome to see us there again.
|
07 July 2008
Ginlong accepted the invitation to join the national wind turbine aerodynamic design and production project. The agreement for this project had signed on 25th June, 2008, the project had immediately launched on 1st July, 2008. The project will cover the aerodynamic design and optimization for distributed small - medium scale wind turbine and will eventually lead to a production unit. |
07 June 2008
Ginlong has just returned from a successful three day show in Windpower 2008 in Houston, USA. More than 200 enquries from professionals had been received reflecting the high demand for Ginlong products. Some exisiting clients had also walked in and expressed pride in using Ginlong products. The new low RPM 7.5kw Permanent Magnet Generator (Alternator) again caught lots of attention and many samples had been ordered.
|
21 April 2008
Ginlong had started the design and construction work for the own designed big wind turnnel in the new factory which is now under construction. This project had also got the technical support from The University of Shanghai for Science and Technology. The turnnel is planned to have a internal dimensions of 3.7m * 3.7m and length about 45m. Once it is finished, it will become one of the biggest wind turnnel in Asian area. |
10 April 2008
EWEC 2008 in Brussels, Belgium was a success for Ginlong. We had totally 192 visitors at our stands who were intersted in our range of products and were clearly impressed by our quality and technical expertise. We are also in discussions with a few potential clients who were interested in collaborations for the manufacture of mechanical parts in the hundred kw range. We had visitors from all over the world visit our stand at EWEC which shows the importance of such an event.
|
|
|
|